Cutting optimization for profiles
Profiles, guides and boxes arrive as bars of a standard length, six metres for example. How many bars a day of production uses depends on how the pieces are laid out. Verto works that layout out for you.
Try it with your own sizes
Enter the bar and the pieces you cut. The plan is recalculated as you type, with the same algorithm as Verto.
Bar
Pieces
Layout strategy
Pieces from all orders are placed longest first, each on the bar where it leaves the least room.
- Bars
- 2
- Waste
- 5.4%
- Left over in total
- 645 mm
How a cutting plan is made
Verto takes every piece of the same material from the orders planned for one day and sorts them from longest to shortest. Each piece goes on the bar where it leaves the least room. After every piece it also counts the width of the saw cut.
To save material, or order by order
Laid out to save material, pieces from all orders are mixed so that as little as possible is left over. Laid out by order, every order gets its own bars: a little more is wasted, but on the shop floor it is easier to see what belongs to whom. You see both layouts side by side, with the waste percentage, and choose which one goes to the floor.
What the saw operator gets
The cutting list for that day. For every bar it gives the order of the pieces with their lengths in millimetres, and what is left at the end. The plan is saved when the planner chooses it, so it does not change under the operator if orders change later.
The warehouse knows how many bars it needs
The total length of all pieces is not the number of bars to bring out. Once saw cuts and leftovers are counted, you need more material than the total suggests. Verto shows the warehouse the real number of bars.
Frequently asked questions
Yes. The standard length and the saw kerf are entered for each material separately.
That piece is left out of the plan and listed separately as oversized.
Yes. Optimization is done per material, so it covers everything cut from bars, for roller blinds and mosquito nets alike.